Quick Link
Quick Contact
Address
No. 09, Zone E, Zhongchu Logistics, Lintong District, Xi'an City, Shaanxi Province
Tel
86-029-19591388038
Our Newsletter
Subscribe to our newsletter for discounts and more.
Before releasing an ASTM A312 TP316L pipe order, Shaanxi Shangyou Stainless Steel Co., Ltd. compares the purchase order with the material certificate, physical marking and packing list. The review covers the specified standard edition, TP316L designation, manufacturing route, dimensions, heat treatment, quantity and required tests. ASTM A312/A312M covers seamless, welded and heavily cold-worked austenitic stainless steel pipe. Those routes are not interchangeable in a controlled order, so the quotation and final document package identify the ordered route rather than referring only to 'stainless steel pipe.'
Quality personnel check outside diameter or nominal pipe size, wall thickness at agreed locations, length, straightness where specified, end condition and visible surface condition. Marking is compared with the heat number and order line. Additional PMI, ultrasonic, eddy-current, radiographic, hydrostatic or other examinations are included only when required by the governing standard, purchase order or approved inspection plan. Reports distinguish mill tests, Shangyou verification activities and third-party witnessed work. This prevents a visual or dimensional check from being presented as a product test that was not actually performed.
After acceptance, pipe ends are protected as required and bundles are secured with supports and lifting points suited to the dimensions and shipment mode. Package marks are checked against the packing list, and the document package is assembled for customer review. Buyers requesting TP316L pipe should state the ASTM edition, seamless or welded route, NPS or OD, schedule or wall thickness, length, end finish, quantity, supplementary tests, marking level, EN 10204 document requirement and destination. If the pipe will enter pressure service, the applicable design code and project ITP should also accompany the inquiry.
|
CTA: Send the pipe route, NPS or OD, wall thickness, length, test requirements and destination for a TP316L quotation. |